KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  3-28-2013
Number of Hours:  2.00
Manual Reference:  Page 8-27
Brief Description:  Upper longeron and skin drilling #6

I used cargo straps to pull the outboard edge of the gear box flush with the vertex of the longerons.

Using the drill cup, I matched drilled and clecoed the 5 holes in each gear box.

Looks good.
' style=

Straps pulling tight

Straps pulling tight

' style=

Right done

Right done

' style=

Left done

Left done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.